Skip to Content

Fort Dix Solar Project Named ENR Best Project

Solar landfill installation best energy/industrial project in 2017 for New York region.

The Fort Dix 16.5 Megawatt Solar Landfill Ballast Mount installation will provide more than 21,000 megawatt hours of energy per year.
The Fort Dix 16.5 Megawatt Solar Landfill Ballast Mount installation will provide more than 21,000 megawatt hours of energy per year.

The Fort Dix 16.5 Megawatt Solar Landfill Ballast Mount installation was recently named by Engineering News-Record (ENR) as the best energy or industrial project for the New York region. Dewberry provided civil, structural, and geotechnical task-based engineering design services for the site improvements to Kupper Engineering, Inc., and contractor Conti of New York, LLC.

The Fort Dix renewable energy project is the largest military solar installation in the Northeast. It includes approximately 50,000 solar panels spanning across a 98-acre solar farm. The renewable energy installation provides more than 21,000 megawatt hours of renewable energy per year. The power generated from the solar farm will be utilized by Joint Base McGuire-Dix-Lakehurst located approximately 1.5 miles away and will also supply power back to the local grid.

The project involved major civil and electrical work, addressing challenges such as restrictions on on-site digging. The team took into account slopes, stormwater runoff, and land-load bearing. Construction and installation activities were performed without piercing the ground so that no construction would penetrate the landfill cap to prevent any unintended damage. A fixed-tilt system maximized the available space. The project was designed to allow for about 25 years of operation on a landfill and for the installation of potential future battery storage on site to preserve power for later use.

The firm’s services enabled the contractor to build on an accelerated schedule. The team maintained the owner’s budget and completed construction one week ahead of schedule.

“We are proud to have been part of this project and we are committed to aiding our solar energy clients through delivering turnkey design services,” said Project Manager and Associate Evan Hill, PE, CME, who is based in the firm’s Mount Laurel, New Jersey, office.

Related Insights

Healthcare Construction & Operations News

September 23, 2026

In this article for Healthcare Construction & Operations News, Melissa Covington and Heather Platt, PE, CHC discuss the modernization of Oklahoma State University Medical Center's labor and delivery facilities while maintaining ongoing hospital operations. The authors highlight the planning, collaboration, and innovative design solutions required to upgrade critical healthcare spaces within an existing facility and share key lessons learned for healthcare renovation projects.

Publication

Annandale Pickleball Facility

August 26, 2026

Our firm renovated a former sports center in Annandale, Virginia, into a modern, two-story sports complex with pickleball courts, golf simulators, a fitness center, and other amenities. With these updates, the space once again supports an active lifestyle for the community. We provided full…

Video

Dimensions®

Our annual review and corporate social responsibility report, in one place.