Set on a severe slope, the project required the design and construction of a major retaining wall to allow for safe excavation, protection to a major gas line, and upgradient roadway and railroad.

Set on a severe slope, the project required the design and construction of a major retaining wall to allow for safe excavation, protection to a major gas line, and upgradient roadway and railroad.

Temporary bypass pumps and piping were installed to bypass sewer flows while construction was being completed.

Temporary bypass pumps and piping were installed to bypass sewer flows while construction was being completed.

A condition assessment report was issued after using various forms of technology to inspect the pipes, identifying several areas of significant ovality, corrosion, as well as other deficiencies.

A condition assessment report was issued after using various forms of technology to inspect the pipes, identifying several areas of significant ovality, corrosion, as well as other deficiencies.

We prepared a comprehensive preliminary engineering report fully compliant with key funding agencies that will be relied upon to fund a final recommended $22-million rehabilitation project.

We prepared a comprehensive preliminary engineering report fully compliant with key funding agencies that will be relied upon to fund a final recommended $22-million rehabilitation project.

Client
City of Martinsville
Location
Martinsville County, VA; Henry County
Services
Engineering
Markets
Water
Cost
$20 million
Completed
Spring 2019
Region
Southeast

The Smith River Interceptor consists of over six miles of 36-inch and 42-inch reinforced concrete pipe (RCP) and corrugated metal pipe (CMP). The interceptor is more than 50 years old and collects all of the sewer flows from the City of Martinsville and
Henry County. We completed a design for an emergency bypass pumping system—which was installed to prepare for emergency response in the event an 80 percent collapsed segment of the sewer were to fail prior to construction. Included in the design
was a new 40-foot retaining wall, which was necessary before excavation could begin to replace the collapsed segment of the sewer. Following replacement of the collapsed sewer, we designed the comprehensive rehabilitation and replacement of the remaining
4.2 miles of 36-inch and 42-inch corrugated metal sections of sewer along the Smith River.

50+

year old interceptor

40

foot retaining wall

6

miles of pipe