Fayetteville Community Solar and Energy Storage Farm and Design-Build
A Design-Build Project to Bring Renewable Energy Infrastructure to a North Carolina Community
- Client
- Fayetteville Public Works Commission
- Location
- Fayetteville, NC
- Markets
- Energy, Community Facilities
- Completed
- 2019
- Region
- Southeast
More than 210,000 people reside in Fayetteville, North Carolina, and it is home to U.S. Army base Fort Bragg. With its growing population, community leaders set out to create a more sustainable energy infrastructure system by developing and constructing a municipal community solar farm. Our design-build team served as the general contractor for the project, where we built a utility-scale renewable energy generation and energy storage system at Fayetteville Public Works Commission’s (PWC) Butler-Warner Generation Plant.
The system consists of a nominal one megawatt alternating current (MWAC) per 1.2 megawatt direct current (MWDC) solar photovoltaic (PV) array, and nominal 500 kilowatt direct current (kWDC) lithium-ion battery bank; wiring; inverters; and controls. This project is the first community-based solar field in North Carolina and one of less than 10 solar projects in the country that utilizes cutting-edge string inverters and a mini battery storage system combination. A ground-mounted array with a single axis tracking system was installed with a two-hour battery discharge capacity duration. Now live, the solar farm provides enough energy to support the equivalent of 100 homes.
100
home capacity
500
kWDC lithium-ion battery bank
2
hour battery discharge capacity duration