We worked with the local utility to establish a new electrical service to relieve the existing overloaded service and provide future capacity.

We worked with the local utility to establish a new electrical service to relieve the existing overloaded service and provide future capacity.

We worked closely with the hospital, contractor, and local code officials to coordinate a detailed plan for critical electrical shutdowns and connections.

We worked closely with the hospital, contractor, and local code officials to coordinate a detailed plan for critical electrical shutdowns and connections.

Our engineers were on site for weekend shutdowns and provided the inspections for the city code officials to allow start-up of the new equipment immediately upon completion.

Our engineers were on site for weekend shutdowns and provided the inspections for the city code officials to allow start-up of the new equipment immediately upon completion.

Client
CarolinaEast Medical Health System
Location
New Bern, NC
Services
Engineering
Square Footage
94,000 SF
Completed
Spring 2019
Region
Southeast

We provided mechanical, electrical, and plumbing (MEP) engineering design services for the expansion and renovation of the existing emergency department and women’s center at CarolinaEast Medical Center (CEMC) located in eastern North Carolina. The project included a nearly 36,000-square-foot addition, and renovation of approximately 58,500 square feet. These renovated areas included the existing emergency department, a laboratory, administration areas, and the main lobby.

The existing central energy plant (CEP) was expanded to support these renovations. The chilled water and normal and emergency electrical service capacity were increased. Additional capacity was provided for further future growth and N+1 capacity. The CEP was designed to house a total of four 500 ton high efficiency chillers for a total capacity of 2,000 tons. Electrical expansion included a new 480 volt, 4,000 amp.

480

volt, 4,000 amp

500

ton high-efficiency chillers

2,000

tons of total CEP capacity